The Xiamen Comprehensive Aviation Training Base has a total floor area of approximately 60,000 square metres and a total investment of approximately 455 million yuan. The project is centred on the core concept of ‘aviation training + industrial services,’ encompassing office spaces, apartments, hotels, and commercial facilities. It is an integrated aviation training and aerospace industry support project at Xiang'an Airport, combining aviation training, aerospace industry offices, conferences, and hotels. Marohn TK Elevator provides the MTL series passenger elevators for the project.
As the Xiamen Comprehensive Aviation Training Base project progresses, the elevator system, as one of the core supporting facilities, plays a crucial role in enhancing efficiency and ensuring safety. Marohn TK Elevator leverages innovative technology, stringent standards, and human-centric design to provide comprehensive elevator solutions for the aviation training base, empowering Xiamen's high-quality development.
Safety First, Quality Assurance Equipped with multiple safety protections (emergency braking, power failure self-rescue, fault warning), fire alarm linkage functionality, and priority response in emergencies to ensure rapid evacuation of personnel.
Smart Interconnection, Digital Management IoT remote monitoring for real-time diagnosis of elevator status and preventive maintenance to reduce downtime. Access control to ensure secure access to specific areas.
Efficient operation, AI-powered intelligent dispatch AI algorithms for real-time scheduling, multi-elevator coordination systems to reduce waiting times, intelligent traffic diversion during peak hours to avoid congestion, and efficient movement of trainees and equipment.
Marohn TK Elevator leverages its mature airport transportation service technology to tailor efficient transportation solutions for the Xiamen Comprehensive Aviation Training Base project, supporting the steady growth of every aviation professional.
Translated with DeepL.com (free version)

Print